Best Practices
Real projects. Real figures.
No glossy brochures, just tangible results from real customer projects. From the initial enquiry to the component in stock. Here you can see the end result.
Best Practices
Real projects. Real figures.
Refrigeration and air-conditioning technology
Case Study: Sustainable Cost Reduction and Supplier Diversification in Refrigeration and Air-Conditioning Technology
Initial situation
Challenge
The greatest challenge lay in identifying alternatives for highly complex and safety-critical components. In addition to technical requirements, it was also necessary to ensure compliance with certifications and quality standards, as well as long-term supply security.
Our approach
- Analysis of a total of 19 components from different product groups
- Conducting international market analyses and targeted supplier sourcing
- Identification, vetting and onboarding of new suppliers
- Technical and commercial evaluation of alternative components
- Close coordination with Engineering and Quality Assurance
Results
- Savings of over 3 million euros a year
- Successful reduction in dependence on suppliers
- Introduction of alternative sources for critical and safety-related components
- Strengthening our negotiating position vis-à-vis existing suppliers
- Improving security of supply and minimising risk
Conclusion
Waste management technology
Case Study: Quality optimisation and sustainable cost reduction through Exxcility’s comprehensive supply chain solution for waste and recycling bins
Initial situation
Challenge
Previous attempts to secure an additional source of supply for the welded assemblies in question were less successful. The current partner experienced significant quality and delivery issues, making it difficult to guarantee long-term supply security for its customers.
Our approach
- Conducting international market analyses and targeted supplier sourcing within our network
- Identification, qualification and integration of the components at our partner’s premises
- Cost-optimised production and logistics planning
- Taking over all warehousing and delivery operations at the customer’s premises
Results
Conclusion
Lichttechnik
Case Study: Kostenreduktion und nachhaltige Bauteiloptimierung in der Lichttechnik
Initial situation
Challenge
The aim was to find a solution that would not only reduce the unit price but also incorporate more sustainable materials or manufacturing approaches – without compromising on quality, functionality or scalability. At the same time, the aim was to systematically tap into the international procurement market in order to identify new opportunities.
Our approach
- Conducting an international market analysis for sheet metal components and relevant manufacturing technologies
- Identification and evaluation of new suppliers from different regions
- A comparison of alternative manufacturing processes in terms of cost, sustainability and technical feasibility
- Close coordination with the development and design teams to optimise component design
- Introduction and support for the integration of suitable suppliers
Results
- Significant reduction in component costs
- A more sustainable design through optimised material and manufacturing approaches
- Technical development of the component through alternative manufacturing processes
- Weight reduction, which enabled further efficiency gains
- Establishing a diversified, international supplier base
Conclusion
Barriers and barriers systems
Case Study: Sustainable Quality Improvement and Supplier Development in Barrier Technology
Initial situation
Challenge
In addition to stabilising quality in the short term, the key challenge was to address the root causes throughout the supply chain in a sustainable manner. Particularly in adhesive applications, the materials, process parameters and manufacturing conditions had to be precisely coordinated.
Our approach
- Detailed analysis of quality issues and causes of rejects
- Use of specialist expertise in adhesive technology (European Adhesive Specialist)
- Training and professional development of the local Chinese supplier
- Implementation of clear quality standards and process guidelines
- Conducting regular process and acceptance audits by our international Supplier Quality Engineers
- Efficient on-site support thanks to a global presence – fast, cost-effective and resource-efficient
Results
- Eliminating quality issues with reflectors and stickers
- Significant reduction in rejection rates during incoming goods inspection
- Sustainable stabilisation of supplier quality
- Significant reduction in internal process costs
- Establishing a secure, long-term supply chain through regular on-site audits
Conclusion
Become our next case study.
Tell us about your component or product group. We’ll give you our honest opinion on where there’s potential.
Commercial vehicle manufacturing
#Consultancy · #Procurement · #Quality
~41%
Cost savings
Two welding assemblies newly qualified for trailer bodywork
- Savings of €122,000 per year
- Just-in-time from the Altenberge warehouse
- Improved UV resistance thanks to an optimised coating
Commercial vehicle manufacturing
#Consultancy · #Procurement · #Quality
~15%
below the previous costs
Welded assemblies and stamped and bent components for a new generation of chassis
- First samples for the start of series production
- Just-in-time from the Altenberge warehouse
- Quality assurance and test reports
Mechanical engineering · Forged parts
#Consultancy · #Procurement · #Quality
141.000 €
Annual savings
New drawing documents for a valve disc, produced from the sample
- Full costs reduced by around 12 per cent
- Latest drawing and specification
- Second supplier, single-source issue resolved
Vehicle construction
#Consultancy · #Procurement · #Quality
3.000 €
Savings per vehicle
An international supplier portfolio for a new vehicle
- Seven-figure savings over the term of the contract
- Around a dozen new suppliers
- A more resilient, more independent supply chain
Large-scale casting
#Consultancy · #Procurement · #Quality
8%
less weight
A new approach to cast components, using our own 3D models
- A high six-figure sum per year
- In-house 3D models and design optimisation
- Start of series production by Exxcility India
What would you like to achieve?
Let’s talk about your potential.
Let's talk
Let's work together to find solutions.
- 4 Zur Steinkuhle, 48341 Altenberge
- +49 (0)2505 93 977 82
- info@exxcility.com
- Exxcility on LinkedIn
Write to us
We’ll get back to you personally, usually by the next business day.
Your message will be transmitted in encrypted form and used solely to respond to your inquiry. Privacy Policy.